-Opening of valves in place, cleaning, lapping of lids and
seats,internal coating, repacking of glands if necessary and
closing with new gaskets.
-Globe/stop/angle/gate/butterfly/non-return and storm valves
-Calculate min. 50 mm if less then
-In case valve is removed to workshop and machined on lathe
-All kind of access works&other renewals, repairs are to be
extra
-Maintanence of remote control systems to be extra
-Renewal of owner supplied valves to be charged 50% of overhaul
-prices excluding pipe/flange modifications